Fort Langley-Aldergrove MLA and then B.C. Deputy Premier Rich Coleman spoke during a press conference in March on the Trans-Canada Six-Laning-Fraser Valley Project. Joining him were, left to right, Langley Township Mayor Jack Froese, Abbotsford West MLA Michael de Jong, and Langley MLA Mary Polak. Langley Times file photo

Highway One widening in Langley to Abbotsford may not happen now

Township mayor said it would be ‘foolish’ to stop widening of freeway from 216 Street to 264th

Highway 1 widening in Langley from 216 Street to 264 Street may not happen after all.

Under the NDP, several transportation projects promised by the former Liberal government are being reviewed, including the widening of the freeway between 216 and 264 Streets.

“In terms of the previous administration’s announcement of additional six-lane of Highway 1 from 216 Street to 264 Street, in[to] Abbotsford, federal dollars have not been committed to this project,” said the Ministry of Transportation in response to a Times request.

“Future Highway 1 corridor improvements are being looked at as part of the broader assessment of the transportation network. Any future projects on Highway 1 will be announced at a future date.”

However, the Ministry of Transportation said it will go ahead with six-laning the highway from 202 Street to 216 Street.

“The project will reduce congestion as well as increase capacity and safety on Highway 1 and improve connectivity between Langley communities north and south of the highway and is anticipated to be complete by fall 2019,” said the Ministry of Transportation.

The B.C. Liberal government announced in March plans to six-lane the highway from 216 Street, as part of phase two of the project. The provincial government committed $113 million to the $235 million project. At the time, the provincial government was seeking contributions from the federal government and the Township.

Design work was expected to begin this fall.

It included replacing the Glover Road overpass which has been hit several times by over-height trucks.

SEE STORY HERE

Since taking office, the NDP provincial government has cancelled or put a hold on several major transportation projects including canceling the Massey bridge project.

Township Mayor Jack Froese was worried the new provincial government was going to cancel the planned highway widening.

“I have been trying to get a meeting with the Ministry of Transportation on this very issue but not have heard back from them,” said Froese on Wednesday.

“It would be foolish to stop it. I believe we have a federal grant for the project to go ahead. So we could lose that.”

This is bad news for the entire region, he said.

“We have to deal with congestion. It’s already here.”

During weekday peak periods, Highway 1, between 216 and 264 has significant traffic congestion, resulting in 1.2 million hours of annual delay to commuters, commercial traffic, and tourists due to heavy traffic through the corridor.

The 232 Street and 264 Street exits see numerous crashes each week. Many motorists complain that the short merge lanes are part of the problem.



monique@langleytimes.com

Like us on Facebook and follow us on Twitter

Just Posted

For the 15th year in a row, Chilliwack businesses give away a car to a family in need

Cynthia Duguay, a single mother to three, was given a 2005 Toyota Corolla S

Another storm set to hit Lower Mainland: Environment Canada

Special weather warning issued for Metro Vancouver, Fraser Valley

Crews respond to fire in detached garage on Maple Avenue in Chilliwack

Firefighters had to access the small fire via neighbouring property on Woodbine Street

Chilliwack Chiefs chosen to play in CJHL Prospects Game

Harrison Blaisdell and Kevin Wall are among 11 BCHL stars selected to play in the showcase game.

Chilliwack soccer star Jordyn Huitema coming home for the holidays

After a crazy-good year with the Canadian national soccer program, the teenager deserves a break.

VIDEO: Ex-NASA engineer pranks mail thieves with glitter bomb trap

Package thefts are common this time of year, but YouTuber Mark Rober used his engineering skills

UBC study could spare cancer patients from side effects of radiation

Her research has drawn a connection of Chromosome 6 genes to pulmonary fibrosis susceptibility.

5 to start your day

Trial date postponed for Oscar Arfmann, Conservation Officers probe cougar attack in Mission and more

‘Laverne & Shirley’ star, ‘Big’ director Penny Marshall dies

Marshall died of complications from diabetes on Monday, Dec. 17, 2018, at her Hollywood Hills home. She was 75.

B.C. Court of Appeal to rule in terror case that centres on RCMP conduct

B.C.’s appeal court is scheduled to release a decision today on a couple whose guilty verdict over plotting to blow up the provincial legislature was thrown out by a lower court judge.

Trump backs off on demand for $5 billion to build a border wall

Congress and President Donald Trump continue to bicker over his demand that lawmakers fund a wall along the U.S.-Mexico border.

Canadian detained in China, not clear if related to two other detentions

Reports suggest the person is not a diplomat or entrepreneur doing business in China.

Trudeau sees 2019 election as choice between positive Liberals, divisive Tories

Trudeau is drawing much the same battle lines that propelled the Liberals to a come-from-behind victory in 2015

Snowfall warning issued for Coquihalla, Highway 3

Make sure to equip winter tires if travelling

Most Read