FILE – This Nov. 3, 2015 file photo shows the Keystone Steele City pumping station, into which the planned Keystone XL pipeline is to connect to, in Steele City, Neb. Pipeline sponsor TC Energy says it has started preliminary work along its route through the U.S. as opponents wait for a judge to rule on their request to block the project. (AP Photo/Nati Harnik, File)

Canadian firm starts US prep work for Keystone XL pipeline

Opponents await a judge’s ruling on their request to block any work

A Canadian company said Wednesday it has started preliminary work along the route of the proposed Keystone XL oil sands pipeline through the U.S. in anticipation of starting construction next month, as opponents await a judge’s ruling on their request to block any work.

TC Energy spokeswoman Sara Rabern said the Calgary-based company was moving equipment this week and will begin mowing and felling trees in areas along the pipeline’s 1,200-mile (1,930-kilometre) route within the next week or so.

The work is planned in Montana, South Dakota and Nebraska, Rabern said. She did not provide further location details.

ALSO READ: U.S. judge blocks construction of $10-billion Keystone XL pipeline

In April the company plans to begin construction at the line’s border crossing in northern Montana. That would be a huge milestone for a project first proposed in 2008 that has since attracted bitter opposition from climate activists who say fossil fuel usage must be curbed to combat global warming.

The company also plans work next month on employee camps in Fallon County, Montana and Haakon County, South Dakota.

Environmental groups in January asked U.S. District Judge Brian Morris to block any work. They said clearing and tree felling along the route would destroy bird and wildlife habitat. The judge in December had denied a request from environmentalists to block construction because no work was immediately planned.

The request by environmentalists came days after the Trump administration approved a right-of-way allowing the $8 billion line to be built across federal land.

ALSO READ: Alberta still pushing for Keystone XL pipeline after U.S. stoppage

“It is irresponsible for TC Energy to jump the gun before Judge Morris rules on our motion,” Stephan Volker, an attorney for the Indigenous Environmental Network and North Coast Rivers Alliance, said Wednesday.

Keystone XL was rejected twice under former President Barack Obama over worries it could make climate change worse.

The pipeline would transport up to 830,000 barrels (35 million gallons) of crude oil daily from western Canada to terminals on the U.S. Gulf Coast.

President Donald Trump has been a strong proponent. The Republican issued a special permit for the pipeline last year after Morris had blocked the project in November 2018, citing potential spills and other environmental concerns.

A legal challenge to Trump’s permit is pending before Morris.

ALSO READ: South Dakota Keystone XL opponents point to N. Dakota spill

Another oil pipeline in TC Energy’s Keystone network in October spilled an estimated 383,000 gallons (1.4 million litres) of oil in eastern North Dakota. Critics say a damaging spill from Keystone XL is inevitable given the length of the line and the many rivers and other waterways it would cross beneath.

Matthew Brown, The Associated Press

Like us on Facebook and follow us on Twitter

Keystone XL

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Police seek suspects allegedly using counterfeit cash at Hope gas station

RCMP say the two suspects attempted to pay with 100 and 50 dollar bills

Truck company hands out thousands of free lunches to truck drivers with local stop in Chilliwack

International Trucks is at 50 fuel stop locations across North America giving away free meals

COLUMN: Let’s avoid public shaming amid a dynamic health crisis

What is unacceptable today might have been fine last week

UFV student nurses offering respite to frontline nurses, care aides

Website helping to match volunteers with those who need help with daily errands

VIDEO: Head-on collision on Chilliwack Mountain Road

Road blocked in both directions Thursday morning

Trudeau rejects mandatory stay-at-home order for now; COVID deaths up

The virus has now infected more than 10,000 Canadians and cost 130 their lives

B.C. health officer says homemade masks may prevent spread of COVID-19 to others

Practising physical distancing, frequent hand washing and resisting touching your face are proven methods

B.C.’s senior home staff measures show results in COVID-19 battle

Dr. Bonnie Henry’s order restricts care aides to one facility

‘A matter of human decency’: Truckers’ union calls on gas stations, rest stops to fully re-open

Teamsters Canada wants feds, provinces to put pressure on facilities to re-open for transport workers

B.C. unveils $3.5M COVID-19 emergency fund for post-secondary students

Money will help students cover living expenses, food, travel, portable computers

‘We will get through this’: B.C. sees new COVID-19 death, but 57% have recovered

A total of 1,066 people have tested positive for the novel coronavirus

Canada’s 75% wage subsidy is coming, but not for several weeks: finance minister

Subsidy will cost Canada $71 billion, but push down cost of emergency benefit, Morneau said

COVID-19: ‘The Ballad of Bonnie Henry’ recorded and released

LISTEN: Quick turnaround for song penned by B.C. Order of Canada musician Phil Dwyer

B.C. adding $300 to monthly income and disability assistance payments

‘Crisis supplement’ for COVID-19 for April, May and June

Most Read